
MD Series
5. Connection
5-5
●
2nd.STAGE only,
Weld force output and weld sequence operation by start input
(When SCHEDULE MODE on the STATUS screen is set to SINGLE and
START SIG. INPUT on the STATUS screen is set to 2ND)
Remarks
SQ: Squeeze time
UP: Upslope time
WE: Weld time
DS: Downslope time
HD: Hold time
*1: The weld sequence does not start even if the 1st.STAGE terminal is closed.
The timing of start input (2ND STAGE), end signal, etc. is the same as that of the
standard starting.
SQ
UP
DS
WE
HD
5ms
*1
(1ST STAGE)
(SOL)
(END)
(2ND STAGE)
(SCH1,2,4,8,16)
Schedule select input
Start input
Start input
Weld force output
Welding current
End signal output
Summary of Contents for MD-A8000B-05 Series
Page 95: ......