MD Series
5. Connection
5-7
●
Starting when 2-step welding is selected
(When SCHEDULE MODE on the STATUS screen is set to DOUBLE and
START SIG. INPUT on the STATUS screen is set to 2ND)
Remarks
SQ: Squeeze time
U1: Upslope 1 time
W1: Weld 1 time
D1: Downslope 1 time
CL: Cool time
U2: Upslope 2 time
W2: Weld 2 time
D2: Downslope 2 time
HD: Hold time
The timing of schedule select, start input, end signal, etc. is the same as that of the
standard starting.
(SCH1~16,2ND STAGE)
(SOL)
(END)
Schedule select , Start input
Weld force output
Welding current
End signal output
SQ
W1
HD
W2
CL
U1
D1
U2
D2