8
CI Maintenance
To Assemble the CI Source
244
5977B Series MSD Operating Manual
To Assemble the CI Source
Materials needed
•
Gloves, clean, lint-free
•
Large (8650-0030)
•
Small (8650-0029)
•
Hex ball driver, 1.5 mm (8710-1570)
•
Hex ball driver, 2.0 mm (8710-1804)
•
Wrench, open-end, 10 mm (8710-2353)
Procedure
Refer to the exploded parts view
and the CI source parts list
on page 245 while using this procedure.
1
Assemble the ion focus lens, entrance lens, and lens insulator.
2
Slide the drawout plate and the drawout cylinder into the source body.
3
Slide the parts assembled in step 1 into the source body.
4
Install the setscrew that holds the lenses in place.
5
Attach the ceramic disk to the repeller and place on top of the source body.
6
Place the heater block assembly on top of the source body.
7
Reinstall the dummy filament, and the filament and attach with the
setscrews.
CAUTION
Always wear clean gloves when working in the analyzer chamber to avoid
contamination.
Summary of Contents for 5977B CI MSD
Page 1: ...Agilent 5977B Series MSD Operating Manual ...
Page 12: ...12 5977B Series MSD Operating Manual ...
Page 34: ...1 Introduction To Replace the Primary Fuses 34 5977B Series MSD Operating Manual ...
Page 142: ...5 Operating in EI Mode To Pumpdown the MSD 142 5977B Series MSD Operating Manual ...
Page 252: ...8 CI Maintenance To Install the CI Source 252 5977B Series MSD Operating Manual ...
Page 253: ......