
W
aiting
F
or
Completion
Of
Measurement
(detecting
completion
of
measurement)
4339B
W
aiting
F
or
Completion
Of
Measurement
(detecting
completion
of
measurement)
Y
ou
can
detect
the
status
of
the
4339B
by
using
the
status
register
,
as
described
in
this
section.
F
or
information
on
the
entire
status
report
system
(for
example
,
information
on
each
bit
of
the
status
register),
refer
to
Chapter
5,
\GPIB
Reference
."
The
measurement
state
is
indicated
by
the
operation
status
register
(refer
to
T
able
5-5 ).
An
SRQ
(service
request)
is
useful
for
detecting
the
completion
of
measurement
in
your
program
by
using
the
information
indicated
by
this
register
.
T
o
detect
the
completion
of
measurement
using
SRQ,
use
the
following
commands
.
*SRE
:ST
A
T:OPER:ENAB
The
procedure
is
given
below
.
1.
Make
the
setup
so
that
the
4339B
generates
an
SRQ
if
bit
4
of
the
operation
status
event
register
is
set
to
1.
2.
Trigger
the
instrument
to
start
a
measurement.
3.
P
erform
interrupt
handling
in
the
program
when
the
SRQ
occurs
.
Figure
4-2.
SRQ
generation
sequence
(when
measurement
nishes)
4-12
Remote
Operation
Summary of Contents for 4339B
Page 10: ......
Page 18: ... ᄌᦝ 0123 45 6789 8 A B C ᄌᦝ 3 DE FG H FG IJ B C K 9 C Copyright 2007 Agilent Technologies ...
Page 20: ......
Page 21: ......
Page 22: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 30: ......
Page 44: ......
Page 55: ...4339B Initial Inspection Figure 1 1 Power Cable Supplied Getting Started 1 11 ...
Page 212: ......
Page 220: ......
Page 230: ......
Page 256: ......
Page 268: ...Procedure 4339B Figure B 5 A1 Main Board B 8 Handler Interface Installation ...