4.12.2 Install the Blind Knives
Procedure
1.
Storage for the removed knives is behind the
side door on the right and you attach them
with a cotter pin.
2.
Go in the machine and push the blind knives
diagonally down to the knife axle.
3.
Turn the lever of the knife axle up.
GUID-7BCC9FA9-D338-47D4-AA4C-7C0FE4E82600-high.jpg [High]
Fig. 19
4.
Release the tailgate with the hydraulic shut-
off valve (1).
5.
Close the tailgate with the controller in the
tractor.
6.
Lift the feed channel floor up with the
controller and double acting valve in the
tractor.
7.
Retract the cutting device with the controller
and double acting valve in the tractor.
GUID-C48609A9-2383-4517-88C6-EC588EF591FA-high.jpg [High]
Fig. 20
GUID-33A8BCDC-BA7F-487D-A314-B39FADBF7DC5 [V1]
4. Maintenance and Lubrication
Baler Wrapper Combination
133
4900.LE.EN01
Summary of Contents for LELY RPC 130 F
Page 2: ......
Page 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Page 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Page 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Page 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Page 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Page 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Page 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Page 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Page 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Page 167: ......
Page 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...