5.5.3 Install the Wheel
Procedure
1.
Install the replacement wheel.
2.
Install the wheel nuts.
3.
Tighten the wheel nuts by hand.
4.
Lower the machine to the ground with the jack.
5.
Tighten the wheel nuts in the correct sequence (crosswise) with a calibrated torque wrench. Tighten
them in the correct sequence and tighten again to the correct torque.
6.
Make sure that the new tyre is at the correct pressure.
7.
After you move for 1 hour tighten the wheel nuts to the correct torque again.
TASK_0A493F6841E84B0BAF42B0A03640672F [V]
5. Troubleshooting
154
Baler Wrapper Combination
4900.LE.EN01
Summary of Contents for LELY RPC 130 F
Page 2: ......
Page 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Page 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Page 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Page 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Page 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Page 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Page 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Page 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Page 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Page 167: ......
Page 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...