4.6 Tighten the Chains of the Pick-Up, Bale Chamber and Feed Rotor
Before starting the procedure
After the first 1000 bales it is necessary to adjust the tension of the chains.
Procedure
1.
Set the machine to "OFF" refer to the shut down procedure for maintenance.
2.
Make sure that the guide wheels are in the transport position.
3.
Open the side cover on the left side.
4.
Remove the bolts (2) and remove the pick-up
cover (1).
GUID-851E9DBD-0070-48DF-A6B8-602454992268-high.jpg [High]
Fig. 6
5.
Loosen the bolt on the chain tensioner (3) of
the pick-up chain (4).
6.
Push the chain tensioner (3) up until the
chain is the correct tension.
7.
Tighten the bolt on the chain tensioner.
8.
Examine the indicator (5) on the automatic
chain tensioner (1) of the pick-up chain (2).
The indicator must show more than 10.
9.
If the indicator is not more than 10, it is
necessary to replace or decrease the length
of the chain.
GUID-786B6675-B7F7-4C60-A3E6-893B4808EFD2-high.jpg [High]
Fig. 7
GUID-23A26E00-AF85-44D6-BDAD-9B38FCB88708 [V1]
4. Maintenance and Lubrication
124
Baler Wrapper Combination
4900.LE.EN01
Summary of Contents for LELY RPC 130 F
Page 2: ......
Page 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Page 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Page 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Page 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Page 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Page 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Page 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Page 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Page 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Page 167: ......
Page 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...