4.1 Preventative Maintenance Schedule
Interval
General maintenance tasks
After
the
first
100
Bales
10
hours
First
500
Bales
Every
500
Bales
Every
3000
Bales
End of
Seaso
n
Mainte
nance
at the
Start
of the
Seaso
n
After 6
Years
Other
X
First
Work
Hour.
• Tighten the chains of the
pick-up, the bale chamber
and the feed rotor
• Tighten the chains of the
wrapping table and the
wrapping ring
• Tighten the bolts on the
wheels
• Tighten the bolts of the
axle with a torque of 500
Nm.
X
• Examine the hydraulic
filter
• Examine the oil level of
the chain lubrication
• Examine the hydraulic
hoses for damage and
leaks
• Check the tire pressure.
X
First
three
week
s.
• Lubricate the knife lever
only on machines with
cutting devices XtraCut 17
or XtraCut 25.
X
More
often,
in
sandy
condit
ions
twice
per
day.
• Sharpen or replace the
knives
• Lubricate parts of the
machine
• Adjust the belt guide
pulleys.
4
GUID-C8AF48FF-4B93-460D-8144-55FC56D8609C [V1]
4. Maintenance and Lubrication
Baler Wrapper Combination
113
4900.LE.EN01
Summary of Contents for LELY RPC 130 F
Page 2: ......
Page 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Page 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Page 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Page 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Page 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Page 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Page 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Page 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Page 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Page 167: ......
Page 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...