After finishing the procedure
1. At the start of each bale, move continuously between intake of the
swath on the left and right side of the pick-up. Do this until the set work
pressure is correct on the pressure gauge (4).
2. Drive straight for 10 – 20 m (33 – 66 ft) with the swath to go in on the
right side of the pick-up.
3. Move to the other side and drive 10 – 20 m (33 – 66 ft) with the swath
to go in on the left side of the pick-up.
Do steps 2 and 3 and frequently and examine the belts (2).
Examine and do the work as follows:
1.
Look from the tractor and at the belt.
2.
Make sure that the belts are in their correct position and no material
falls from the clearance (1) between the belts.
3.
If material falls from one side, immediately drive to the other side of
the swath. The material will go in on the other side of the pick-up.
(When material falls from one side, the baling chamber is not filled
sufficiently at that side).
GUID-29FFAC80-CF80-467C-8EB4-34762129EF36-high.jpg [High]
Fig. 46 Belts.
(1)
Bale size indicator.
(2)
Pressure gauge.
3. Operation
100
Baler Wrapper Combination
4900.LE.EN01
Summary of Contents for LELY RPC 130 F
Page 2: ......
Page 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Page 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Page 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Page 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Page 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Page 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Page 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Page 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Page 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Page 167: ......
Page 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...