3.1.5 To Prepare Before You Connect the Power Supply
Before starting the procedure
WARNING: Electricity.
Injury to persons.
Only an approved technician can install the cable harness for the power supply from the
battery.
CAUTION: Electricity.
Damage to the machine.
The Control Unit will only operate with 12 volts. Do not operate with an alternative on-
board power supply.
CAUTION: Electricity.
Damage to the machine.
Do not change the polarity of the power supply of the tractor, otherwise damage to the
control electronics will occur.
Procedure
1.
Make sure that the battery of the tractor can supply 12 Volt and 30 amp and there is a load socket
(DIN 9680). If not available speak to your service provider to install a socket.
2.
Connect the power of the electronics of the machine to the socket.
3.
Install the holder of the controller in the tractor near to the tractor driver.
4.
Connect the E-Link Pro. The 12-pole plug connects to the back of the E-link Pro.
5.
Connect the lighting cable of the machine to the tractor.
GUID-51562A7A-D306-45D1-A3D3-1B8F455124D6 [V1]
3. Operation
70
Baler Wrapper Combination
4900.LE.EN01
Summary of Contents for LELY RPC 130 F
Page 2: ......
Page 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Page 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Page 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Page 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Page 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Page 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Page 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Page 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Page 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Page 167: ......
Page 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...