GUID-4DE2CFC5-C915-4D9B-BEF7-5D6C61D53ED9-high.jpg [High]
Fig. 21
14.
Set the wrapping ring safeguard 1 (1), to stop the wrapping ring from lowering.
15.
Set the wrapping ring safeguard 2 (2), to stop the wrapping ring from turning.
16.
Make sure that the work lights are “Off”.
17.
Fold up and lock the ladder of the maintenance platform.
18.
Remove harvest remains and clods of dirt which are in contact with the machine and make sure that
the lighting set and reflectors are clean.
19.
Clean the area near the brake system, near the wheel rims and the brake drums.
20.
Make sure that the brake operates before
driving:
a) For machines with an active hydraulic
brake: make sure that you connect the
hydraulic brake hose
b) For machines with a pneumatic brake:
make sure that you set the lever on the
variable load valve (2) to the full brake
effect
c) Before you continue make sure that the
pressure in the reservoir of the pneumatic
brake is correct.
21.
Remove the wheel chocks from the wheels
on the machine.
22.
Release the parking brake.
GUID-EAEC9FCE-E67A-4DAF-82E8-5927AA3DAC27-high.jpg [High]
Fig. 22
Related Links
3. Operation
84
Baler Wrapper Combination
4900.LE.EN01
Summary of Contents for LELY RPC 130 F
Page 2: ......
Page 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Page 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Page 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Page 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Page 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Page 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Page 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Page 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Page 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Page 167: ......
Page 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...