4.14 Adjust and Replace the Belt Guide Pulleys
Before starting the procedure
Weekly examine the belt pulleys on the wrapping table for smooth running.
Procedure
1.
Make sure that the machine is "OFF" refer to
the shutdown procedure for maintenance.
2.
Make sure that all pulleys (2) can turn
smoothly.
a) If necessary, loosen the bolt (1) a small
quantity
b) If necessary, replace the pulley.
GUID-4D063C03-373A-4F40-B0B5-A6BCAC729912-high.jpg [High]
Fig. 22
(1)
Nut.
(2)
Belt Guide Pulley.
GUID-8102B720-F663-439F-927E-AFA4008675D8 [V1]
4. Maintenance and Lubrication
Baler Wrapper Combination
135
4900.LE.EN01
Summary of Contents for LELY RPC 130 F
Page 2: ......
Page 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Page 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Page 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Page 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Page 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Page 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Page 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Page 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Page 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Page 167: ......
Page 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...