14
When the test handle is inserted into the test switch, all current circuits on
the transformer side are short-circuited and all voltage circuits are opened,
except for terminal 1 and 12, which are used for dc supply of the terminal.
The testing equipment connected to the test handle is automatically con-
nected to the terminal.
You can plug the test handle into the test switch or withdraw it from the
test switch to the intermediate position. In this position, the trip circuits
are blocked, but the voltage and current circuits are connected to the relay.
You can plug the test handle into the test switch or remove it from the test
switch completely by releasing the top and bottom latches.
4.4 Functional test
All included functions are tested according to the test instructions in each
function description. You can block functions individually during the test,
so that only the function that is to be tested is active. In this way, you can
test slower back-up measuring functions without the interference of faster
measuring functions. You can also test the terminal without changing the
configuration and the setting of the terminal.
The functions are blocked on the built-in MMI at:
Test
TestMode
BlockFunctions
The setting is only valid at test mode. If the functions are blocked in this
menu, they are blocked only while the terminal is in test mode. When
using this blocking feature, remember that for testing a function, you must
activate not only the function, but the whole sequence of functions that are
interconnected in a sequence (from measuring inputs to binary output
contacts) including logic, and so on.
4.5 Test termination
When the whole test is finished, reconfigure the terminal into normal
operating mode on the built-in MMI at:
Test
Test Mode
Operation
Set Test/Mode/Operation = Off, and save the test mode setting. The yel-
low LED goes out.
Summary of Contents for REC 561
Page 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Page 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Page 49: ...ABB Network Partner AB Page IV ...
Page 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Page 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Page 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Page 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Page 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Page 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Page 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Page 519: ...ABB Network Partner AB Page IV ...
Page 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Page 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Page 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Page 634: ......
Page 635: ......
Page 636: ......
Page 637: ......
Page 638: ......
Page 639: ......
Page 640: ......
Page 641: ......
Page 642: ......
Page 643: ......