ABB Network Partner AB
Event recorder - Station
Monitoring System
Version 1.0-00
1MRK 580 139-XEN
Page 7
-
66
For each of the binary input and output signals, a user-defined name can
be programmed at:
Configuration
Slotnn-XXXX (ex. Slot15-BOM3)
See Disturbance report - Settings (1MRK 580 133-XEN), for more infor-
mation.
4 Testing
During testing, the Event recorder can be switched off if desired. This is
found in the SMS or Substation Control System (SCS).
Summary of Contents for REC 561
Page 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Page 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Page 49: ...ABB Network Partner AB Page IV ...
Page 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Page 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Page 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Page 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Page 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Page 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Page 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Page 519: ...ABB Network Partner AB Page IV ...
Page 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Page 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Page 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Page 634: ......
Page 635: ......
Page 636: ......
Page 637: ......
Page 638: ......
Page 639: ......
Page 640: ......
Page 641: ......
Page 642: ......
Page 643: ......