ABB Network Partner AB
Synchronism and energizing
check for single circuit breaker
with voltage selection
Version 1.0-00
1MRK 580 152-XEN
Page 5
-
24
4.2.2 Test of phase
difference
The phase difference is set at 45° on the MMI, and the test should verify
that operation is achieved when the PhaseDiff (phase difference) is lower
than 45°.
1
Set these MMI settings:
2
Test with PhaseDiff = 0°
Apply voltages U-line (UL1) = 100% U
r
/sqr3 and U-bus (U5) = 100%
U
r
/sqr3, with a phase difference equal to 0° and a frequency differ-
ence that is lower than 50 mHz.
Check that the SYN1-AUTOOK and SYN1-MANOK outputs are
activated.
3
The test can be repeated with other PhaseDiff values to verify that the
function operates for values lower than the set ones. By changing the
phase angle on U1 connected to U-bus, b/- 45°. You can
check that the two outputs are activated for a PhaseDiff lower than
45°. It should not operate for other values. See Fig. 11.
Fig. 11
Test of phase difference
Parameter
Setting
Operation
On
InputPhase
UL1
USelection
SingleBus
AutoEnerg
Off
ManEnerg
Off
UHigh
70%
Ur/sqr3
ULow
40%
Ur/sqr3
FreqDiff
0,05 Hz
PhaseDiff
45°
UDiff
15%
tAutoEnerg
0.5 s
tManEnerg
0.5 s
+45
o
-45
o
No operation
U-Bus
U-Line operation
U-Bus
(X80152-11)
Summary of Contents for REC 561
Page 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Page 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Page 49: ...ABB Network Partner AB Page IV ...
Page 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Page 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Page 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Page 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Page 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Page 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Page 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Page 519: ...ABB Network Partner AB Page IV ...
Page 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Page 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Page 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Page 634: ......
Page 635: ......
Page 636: ......
Page 637: ......
Page 638: ......
Page 639: ......
Page 640: ......
Page 641: ......
Page 642: ......
Page 643: ......