ABB Network Partner AB
- 1
Page
Function:
1 Receiving and storage
Remove the terminal from its transport case and perform a visual inspec-
tion of any possible transport damages. Check that the delivered terminal
has the correct data on the rating plate at the front of the terminal, that is,
rated current, rated voltage, and rated dc voltage.
If the terminal is to be stored before installation, this must be done in a
dry, dust-free place, preferably in its original transport case.
2 Installation
2.1 Mechanical installation
This terminal is built in the mechanical packaging system described in
the Buyer’s Guide Series REx 500 Mechanical design and mounting
accessories (1MRK 514 003-BEN).
Depending on how the terminal is to be mounted, a suitable mounting kit
is used. For 19-inch rack mounting, flush mounting, and wall mounting,
you can order mounting kits that contain all parts needed for the mount-
ing, including screws and an assembly instruction.
Avoid dusty, damp places or conditions that cause rapid temperature vari-
ations, powerful vibrations, or shocks.
2.1.1 19” rack installation
For mounting the terminal in a 19-inch rack, you need mounting angles.
The type of mounting angles depends on the size of the terminal.
You can mount each mounting angle on either side of the terminal. Mount
the angles on the terminal with the included screws according to Fig. 1.
All included screws have TORX T20 type grips.
3
Installation and commissioning
1MRK 580 166-XEN
Version 1.0-00
October 1996
Basic
Summary of Contents for REC 561
Page 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Page 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Page 49: ...ABB Network Partner AB Page IV ...
Page 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Page 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Page 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Page 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Page 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Page 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Page 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Page 519: ...ABB Network Partner AB Page IV ...
Page 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Page 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Page 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Page 634: ......
Page 635: ......
Page 636: ......
Page 637: ......
Page 638: ......
Page 639: ......
Page 640: ......
Page 641: ......
Page 642: ......
Page 643: ......