Interlocking
ABB Network Partner AB
1MRK 580 151-XEN
Page
6 - 121
Version 1.0-00
A1A2CLTR
Signal if a bus-section coupler connection exists between bus sections A1
and A2.
VPA1A2TR
The switch status of A1A2_DC is valid.
EXDUP_BS
Signal if no transmission error from the bay containing the above infor-
mation. This signal is taken from the data valid output on the command
function block.
For a bus-coupler bay in section 1, these conditions are valid:
Fig. 18
Signals to a bus-coupler bay in section 1 from a bus-coupler
bay in an other section
For a bus-coupler bay in section 2, the same conditions as above are valid
by changing section 1 to section 2 and vice versa.
4.2.2.3 Parameter setting
If there is no bypass busbar and therefore no Q20 and Q7 disconnectors,
then the interlocking for Q20 and Q7 is not used. The states for Q20, Q7,
Q75, BC_AB are set to open by setting the appropriate module inputs as
follows. In the functional block diagram, 0 and 1 are designated 0=FIXD-
OFF and 1=FIXD-ON:
• Q20_OP = 1
• Q20_CL = 0
• Q7_OP = 1
• Q7_CL = 0
• Q75_OP = 1
• Q75_CL = 0
• BC_AB_CL = 0
BCABCLTR (sect.2)
BC_AB_CL
DCCLTR (A1A2)
&
VPDCTR (A1A2)
VP_BC_AB
VPDCTR (B1B2)
&
DCCLTR (B1B2)
VPBCABTR (sect.2)
&
EXDUP_DC (A1A2)
EXDUP_BC
EXDUP_DC (B1B2)
EXDUP_BC (sect.2)
(X80151-18)
Summary of Contents for REC 561
Page 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Page 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Page 49: ...ABB Network Partner AB Page IV ...
Page 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Page 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Page 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Page 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Page 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Page 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Page 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Page 519: ...ABB Network Partner AB Page IV ...
Page 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Page 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Page 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Page 634: ......
Page 635: ......
Page 636: ......
Page 637: ......
Page 638: ......
Page 639: ......
Page 640: ......
Page 641: ......
Page 642: ......
Page 643: ......