Synchronism and energizing
check for single circuit breaker
with voltage selection
ABB Network Partner AB
1MRK 580 152-XEN
Page
5 - 27
Version 1.0-00
4.3.3 Energizing in both
directions (DLLB or
DBLL)
1
Change the MMI settings AutoEnerg and ManEnerg to Both.
2
Apply a single-phase voltage of 30% U
r
/sqr3 to the U-line (UL1) and
a single-phase voltage of 100% U
r
/sqr3 to the U-bus (U5).
3
Check that the “SYN1-AUTOOK” and “SYN1-MANOK” outputs
are activated.
4
Change the connection so that the U-line (UL1) is equal to100% U
r
/
sqr3
and the U-bus (U5) is equal to 30% U
r
/sqr3.
5
The outputs
should still be activated.
6
The test can be repeated with different values on the U-bus and the U-
line.
7
Restore the equipment to normal or desired settings.
4.3.4 Test of voltage
selection
This test should verify that the correct voltage is selected for the measure-
ment in the energizing function used in a double-bus arrangement. Apply
a single-phase voltage of 30% U
r
/sqr3 to the U-line (UL1) and a single-
phase voltage of 100% U
r
/sqr3 to the U-bus (U5).
If the SYN1-UB1/2OK inputs for the fuse failure are used, normally they
must be activated, thus activated and deactivated must be inverted in the
description of tests below.
1
Set these MMI settings:
Parameter
Setting
Operation
On
InputPhase
UL1
USelection
DbleB
AutoEnerg
Both
ManEnerg
Both
UHigh
80%
U
r
/sqr3
ULow
40%
U
r
/sqr3
FreqDiff
0,05 Hz
PhaseDiff
45°
UDiff
15%
tAutoEnerg
0.5 s
tManEnerg
0.5 s
Summary of Contents for REC 561
Page 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Page 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Page 49: ...ABB Network Partner AB Page IV ...
Page 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Page 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Page 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Page 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Page 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Page 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Page 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Page 519: ...ABB Network Partner AB Page IV ...
Page 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Page 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Page 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Page 634: ......
Page 635: ......
Page 636: ......
Page 637: ......
Page 638: ......
Page 639: ......
Page 640: ......
Page 641: ......
Page 642: ......
Page 643: ......