For command supervision, COMCON has two time parameters. The
supervision checks the time between select and execute signals and
checks the response on a request for selection including reservation of
other bays. When any of them is incorrect, COMCON indicates this with
the LO_OP_T and RES_ERR outputs. Also, the CANCEL output gives a
signal (pulse) to reset the selected command in SWICON.
Parameters
T_LO_OP
Maximum time between a select and the execute command coming from
the operator. Also the maximum time between the request to override and
the following select.
T_RES
Allowed time (for BAYCON) to make the reservation.
3.2.3 SWICON
SWICON handles basically two functions, indication and supervision of
operation. The indication inputs can either be three phase including the
pole discordance check (SWICONA and SWICONB) or the single phase
(SWICONC). The indication part checks the position indication informa-
tion and gives indications (OX, CX) on the results. The POSIND_V input
is used at external evaluations of the positions or at board error.
POSIND_V = True means valid positions. The result of (OX, CX) is (0, 0)
(for intermediate position or when POSIND_V = False). It also includes
the function for manual position updating. The position indication can be
set manually, and the updating from the process is stopped. Manual updat-
ing is indicated by MA_UPD_P.
The indication part has two timer parameters. The POS_ERR is activated
momentary at the intermediate position (1, 1) but is delayed the
T_POSERR time at the position (0, 0). The POL_DISC output is activated
when a pole discordance is detected and the T_POL timer expires.
SWICON has inputs and outputs for selection and execution. In case the
SWICON assumes the select-open or -close-before-execute principle (that
is, either OPEN or CLOSE is set), the SELx (SELECT) signal from BAY-
CON energizes the selection outputs of a given direction, SEL_OPEN or
SEL_CLOS. After it has received the FDB_SEL signal, it proceeds with
an EXECUTE command, which activates both EXE_OPEN and
EXE_CLOS.
In case of the select-before-execute-open or -close principle, SWICON
receives only a SELECT signal (that is, without the OPEN and CLOSE
directions). Now it activates both the SEL_OPEN and SEL_CLOS selec-
tion outputs. After receiving a FDB_SEL feedback select, it waits for the
Summary of Contents for REC 561
Page 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Page 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Page 49: ...ABB Network Partner AB Page IV ...
Page 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Page 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Page 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Page 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Page 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Page 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Page 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Page 519: ...ABB Network Partner AB Page IV ...
Page 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Page 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Page 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Page 634: ......
Page 635: ......
Page 636: ......
Page 637: ......
Page 638: ......
Page 639: ......
Page 640: ......
Page 641: ......
Page 642: ......
Page 643: ......