Interlocking
ABB Network Partner AB
1MRK 580 151-XEN
Page
6 - 113
Version 1.0-00
VP_BC_AB
The switch status of BC_AB is valid.
VP_BC_AC
The switch status of BC_AC is valid.
VP_BC_BC
The switch status of BC_BC is valid.
EXDUP_BC
Signal if there is no transmission error from bay BC (bus-coupler bay).
These signals from each bus-coupler bay (ABC_BC) are needed:
BCABCLTR
Signal if a bus-coupler connectionthrough the own bus coupler exists
between busbar A and B.
BCACOPTR
Signal if there is no bus-coupler connectionthrough the own bus coupler
between busbar A and C.
BCACCLTR
Signal if a bus-coupler connectionthrough the own bus coupler exists
between busbar A and C.
BCBCOPTR
Signal if there is no bus-coupler connection through the own bus coupler
between busbar B and C.
BCBCCLTR
Signal if a bus-coupler connection through the own bus coupler exists
between busbar B and C.
VPBCABTR
The switch status of BC_AB is valid.
VPBCACTR
The switch status of BC_AC is valid.
VPBCBCTR
The switch status of BC_BC is valid.
EXDUP_BC
Signal if there is no transmission error from the bay that contains the
above information. This signal is taken from the data valid output on the
command function block.
Summary of Contents for REC 561
Page 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Page 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Page 49: ...ABB Network Partner AB Page IV ...
Page 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Page 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Page 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Page 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Page 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Page 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Page 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Page 519: ...ABB Network Partner AB Page IV ...
Page 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Page 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Page 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Page 634: ......
Page 635: ......
Page 636: ......
Page 637: ......
Page 638: ......
Page 639: ......
Page 640: ......
Page 641: ......
Page 642: ......
Page 643: ......