
Manual 35116
505HT for Pelton Turbines
Woodward
153
Chapter 6.
Asset Management and Refurbishment Scheduling
Period
This product is designed for continuous operation in a typical industrial environment and includes no
components that require periodic service. However, to take advantage of related product software and
hardware improvements, we recommend that your product be sent back to Woodward or to a Woodward
authorized service facility after every five to ten years of continuous service for inspection and component
upgrades. Please refer to the above service programs when returning products.
Released
Содержание 505HT
Страница 23: ...Manual 35116 505HT for Pelton Turbines Woodward 21 Figure 2 2 505D Outline Drawing Released...
Страница 196: ...Manual 35116 505HT for Pelton Turbines Woodward 194 Figure F 10 Deflector Logic Released...
Страница 197: ...Manual 35116 505HT for Pelton Turbines Woodward 195 Revision History New Manual Released...
Страница 198: ...Manual 35116 505HT for Pelton Turbines Woodward 196 Declarations Released...