10
Regulatory Compliance
European Compliance for CE Marking:
These listings are limited only to those units bearing the CE Marking.
EMC Directive Declared to Directive 2014/30/EU of the European Parliament and of the
Council of 26 February 2014 on the harmonization of the laws of the
Member States relating to electromagnetic compatibility. (EMC)
Low Voltage Directive: Declared to Directive 2014/35/EU on the harmonization of the laws of
the Member States relating to the making available on the market of
electrical equipment designed for use within certain voltage limits.
North American Compliance:
CSA: CSA Certified for Ordinary Locations.
For use in Canada and the United States
Certificate 70006135
This product is certified as a component for use in other equipment. The final combination is subject to
acceptance by the authority having jurisdiction or local inspection.
Special Conditions for Safe Use
A fixed wiring installation is required. Field wiring must be in accordance with the Local Inspection
Authority having jurisdiction. On high voltage versions of the control the interior of the enclosure shall not
be accessible in normal operation without the use of a tool.
Field wiring must be suitable for the following temperatures:
•
Power Input rated minimum of +95˚C.
•
All remaining connections; +10˚C above highest ambient.
A switch or circuit breaker shall be included in the building installation that is in close proximity to the
equipment and within easy reach of the operator. The switch or circuit breaker shall be clearly marked as
the disconnecting device for the equipment. The switch or circuit breaker shall not interrupt the Protective
Earth (PE) conductor.
The 505 Digital Control shall not be installed in areas exceeding Pollution Degree 2 as defined in IEC
60664-1.
Protective Earth Grounding of the 505 Digital Control is required to be connected to the PE terminal.
The Real Time Clock Battery located on the CPU board is not to be recharged and is not user
replaceable. Contact a Woodward Authorized Service Center if a replacement service is needed.
This equipment must be installed in an area or enclosure providing adequate protection against high
impact. (7 Joules) The control is rated for 2 Joules impact.
Released
Содержание 505HT
Страница 23: ...Manual 35116 505HT for Pelton Turbines Woodward 21 Figure 2 2 505D Outline Drawing Released...
Страница 196: ...Manual 35116 505HT for Pelton Turbines Woodward 194 Figure F 10 Deflector Logic Released...
Страница 197: ...Manual 35116 505HT for Pelton Turbines Woodward 195 Revision History New Manual Released...
Страница 198: ...Manual 35116 505HT for Pelton Turbines Woodward 196 Declarations Released...