en
Installation of CIF module
176
WILO SE 2021-12
Installation
DANGER
Risk of fatal electrical shock!
Immediate risk of fatal injury if live components are touched!
• Check whether all connections are voltage-free!
Fig. 27:
Cover for Wilo-Smart Connect Module
BT
1.
Loosen the four screws from the upper part of the electronic module.
2.
Remove the upper part of the electronic module and put it aside.
3.
Insert the Wilo-Smart Connect Module BT into the designated interface Wilo-Con-
nectivity Interface. See Fig. 25, Item 3.
4.
Refit the upper part of the electronic module!
If the Wilo-Smart Connect Module BT is only to be checked, the upper part of the elec-
tronic module can remain installed. To carry out a check, proceed as follows:
1.
Loosen the screw of the Wilo-Smart Connect module cover and open the cover.
2.
Check Wilo-Smart Connect Module BT.
3.
Close the cover again and fasten it with the screw.
Due to its design, the Wilo-Smart Connect Module BT can only be plugged in in one
alignment. There is no further fixing of the module itself. The Wilo-Smart Connect
Module BT cover on the upper part of the electronic module (Fig. 27) holds the module
firmly in the interface.
CAUTION
IP55 protection is only guaranteed if the Wilo-Smart Connect Module BT cover is in-
stalled and screwed tight!
9
Installation of CIF module
DANGER
Risk of fatal electrical shock!
Immediate risk of fatal injury if live components are touched!
• Check whether all connections are voltage-free!
CIF modules (accessories) are used for communication between pumps and building
management systems. CIF modules are plugged into the electronic module (Fig. 25,
Item 4)
ƒ
For twin-head pumps, only the main pump must be equipped with a CIF module.
ƒ
For pumps in Y-pipe applications in which the electronic modules are connected to
each other through the Wilo Net, only the main pump also requires a CIF module.
NOTICE
Explanations on commissioning as well as application, function and configuration of
the CIF module on the pump are described in the installation and operating instruc-
tions for the CIF modules.
10
Commissioning
ƒ
Electrical work: Electrical work must be performed by a qualified electrician.
ƒ
Installation/dismantling work: The installation/dismantling must be carried out by a
qualified technician who is trained in the use of the necessary tools and fixation
materials.
ƒ
The product must be operated by persons who are instructed on how the complete
system functions.
Содержание Stratos GIGA2.0-D
Страница 2: ...Fig I Stratos GIGA2 0 I Stratos GIGA2 0 D DN 40 DN 100 D...
Страница 3: ...Fig II Stratos GIGA2 0 I Stratos GIGA2 0 D DN 40 DN 100 E E D...
Страница 4: ...Fig III Stratos GIGA2 0 I Stratos GIGA2 0 D DN 100 DN 125 D D E...
Страница 5: ...5 Deutsch 6 English 139 Fran ais 270 Nederlands 409...
Страница 548: ......
Страница 549: ......
Страница 550: ......
Страница 551: ......