Maintenance Protocol WP-070-
EN
Solfog V3
Z:\org-wdt\02 Qualitätsmanagement\ISO 9001\MS - Originale - Formuale, Prüfbericht etc\WDT Wartungsprotokolle WP\WDT-WP-070-EN-Solfog V3 FO 00.docx
Key: X = every 28 days, 1 = monthly, 3 = every 3 months, 6 = every 6 months, etc.;
= Work completed
Page 1 of 1
This protocol is to be completed by the maintenance technician! We reserve the right to determine the warranty
conditions when no completed and signed maintenance protocol is available.
Object:
Maintenance year: 20___
City, street, house number:
Device type:
Year of manufacture:
Serial number:
Activity
M
ain
te
nance
in
te
rval
in
m
onths
M
onth 1
M
onth 2
M
onth 3
M
onth 4
M
onth 5
M
onth 6
M
onth 7
M
onth 8
M
onth 9
M
onth 10
M
onth 11
M
onth 12
Comment / additional tasks
1
Brine fog maker
1.1
Carry out disinfection according to
OI Chapter
7.8
, at least every 28 days!
X
1.2
Clean fog maker diaphragm with a soft cloth
1
1.3
Grease O-ring (on top of the fog maker
container)
1
1.4
Check peristaltic pump for function and leaks 1
1.5
Check device for leaks and conduct a visual
check
3
1.6
Run test programmes
3
1.7
Clean device
6
1.8
Check electric cabling
6
1.9
Change the hose kit (only use WDT original
replacement part)
12
1.10
Replace filter star, when changing the
fragrance
12
1.11
Replace hose lines
12
Additional remarks:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Maintenance carried out and device checked for function:
Date:
Signature
Countersigned by operator: