EN - Additional sheet: flush mounted box V2
Index: 03
Change date: 01/12/2017
BA-Nr.: BB DW 001-03 Montage Unterputzdose V2 DE EN RU.docx
Page
2
of
2
2
Installation in brickwork
a) Chisel out brickwork for flush
mounted box and empty conduit
Diameter empty conduit type 32 (ID
25mm)
Bend radius min. 10cm
Dimensions for break out works
1-fold: HxWxD min. 105x72x60mm
2-fold: HxWxD min. 138x72x60mm
3-fold: HxWxD min. 171x72x60mm
4-fold: HxWxD min. 205x72x60mm
b) Break out an orifice for the empty
conduit connection to the desired rated
break point
c) Install the flush mounted box and the
empty conduit with electrician cast or
building foam in the wall, approximately
20 mm protruding due to flush system
Insert cable
d) Install the supplied construction
protection cap in the flush mounted box
e) Plaster the brickwork so that the
flush mounted box flushes with the
plaster.
f) Apply sealant for vapour barrier foil
g) Adhere vapour barrier foil
No humidity may penetrate!
h) Enter the flush mounted box until the
construction protection cap
i) Remote protection cap
Clamp the push button plate.
Seal the push button plate against the
flush mounted box: apply appropriate
sealant on the flush mounted box and fix
with 4 screws
No humidity may penetrate!
WDT - Werner Dosiertechnik GmbH & Co. KG
Hettlinger Str. 17, D-86637 Wertingen-Geratshofen
Phone:+49 (0) 82 72 / 9 86 97 – 0 ; Fax – 19
E-mail:
Brickwork
Fl
ush
m
ou
nt
ed
bo
x
Flush mounted