Brine Fogging System Type SOLFOG V3
Index: 02
Change date: 19/09/2023
OI No.: BA DW 042-02 Solfog V3 CB36 EN.docx
Page 62 of 65
11.3
Commissioning protocol
This protocol is to be completed by the commissioning technician! Without a completed and
signed commissioning protocol, all warranty claims become void!
The commissioning protocol can be found in the accompanying documentation in Chapter 12,
page 64.
11.4
Operation data sheet
NOTICE
During commissioning, enter the operating parameters in the operation data sheet!
Menu
Factory
setting
Setting
range
Step
During commissioning
Date
Optimised during opera-
tion
Date
Pause time
5 minutes
1-90
minutes
1
Fogging time 10 seconds 5-120
seconds
1
Button cycle 30 minutes 1-60
minutes
Operation
mode
Cyclic
Cyclic
Externally
Push button
Fan
60%
60-100%
1
Contrast
8
0-15
1
Push button
illumination
„-„
+ and -
Timer
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
yes
no
00:01-23:59
00:01-23:59
00:01-23:59
00:01-23:59
00:01-23:59
00:01-23:59
00:01-23:59