Brine Fogging System Type SOLFOG V3
Index: 02
Change date: 19/09/2023
OI No.: BA DW 042-02 Solfog V3 CB36 EN.docx
Page 52 of 65
9.3
Check/change hose bracket kit
The pump hose in the pump is subject to mechanical and chemical stresses.
Therefore, the pump hose must be checked once a month in order to detect damage (e.g.,
cracks, discolouration) in due time and to replace the dosing hose.
The dosing hose must be replaced at least every 6 months!
Fig. 66: Individual components of the peristaltic pump
9.3.1
Replace hose bracket kit and roller carrier
See description in Chapter 7.5 on page 24.
31
Transparent protective cover
32
Safety disc
33
Hose bracket with dosing hose
34
Roller carrier
35
Pump casing
36
Sealing washer felt
37
Sealing washer EPDM
38
Gear motor
39
Flat washer
40
Screw
38
40
39
35
36
37
33
34
32
31