Commissioning Protocol IP-070-E
N
Solfog V3
Z:\org-wdt\02 Qualitätsmanagement\ISO 9001\MS - Originale - Formuale, Prüfbericht etc\WDT Inbetriebnahmeprotokolle IP\WDT-IP-070-EN-Solfog V3 FO 00.docx
Page 1 of 1
This protocol is to be completed by the commissioning technician! Without a completed and signed commissioning
protocol, all warranty claims become void!
Object:
Date: __/__/____
City, street, house number:
Device type:
Year of manufacture:
Serial number:
Activity
Completed Comment
1
Commissioning
1.1
Device checked for correct installation
1.2
Device and lines checked for leaks
1.3
Fog line with a maximum length of 4 m, with gradient toward the
brine fog maker
1.4
Roller carrier inserted according to
OI Chapter 7.5
1.5
Disinfection carried out according to
OI
Chapter 7.8
1.6
Brine politainer inserted according to
OI Chapter 7.9
1.7
Settings made, operation mode selected and entered in the operation
data sheet under
Chapter 11.4
1.8
All test programmes checked
1.9
Brine fog maker started
1.10
Device checked for correct operation
2
Other
2.1
Operating instructions reviewed and handed over
2.2
Service and operating personnel instructed
Additional remarks:
Commissioning and instruction carried out by:
Instructed persons:
Signature of commissioner:
Countersigned by operator: