Brine Fogging System Type SOLFOG V3
Index: 02
Change date: 19/09/2023
OI No.: BA DW 042-02 Solfog V3 CB36 EN.docx
Page 26 of 65
7.6
Disassembling the roller carrier
The roller carrier and hose bracket are disassembled in the reverse order.
7.7
Switching on the device
NOTICE
When the device is switched on for the first time, or after a reset, the device starts automati-
cally with the start query.
7.7.1
Start query / initial start of the device
After switching on the device for the first time, or after resetting it to the factory settings, the
language and the parameters for pause time, fogging time and operation mode must first be
entered. The corresponding displays are shown in sequence.
After successful entry, the device is ready for operation.
Fig. 15: Insert the hose bracket
4)
Insert the hose bracket (Fig. 13, No. 33) into the hous-
ing guides until it locks into place completely.
Fig. 16: Turn the roller carrier
5)
Turn the roller carrier (Fig. 13, No. 34) clockwise while
carefully pressing the hose into the housing at the
roller carrier’s flat side until the entire hose is com-
pletely contained in the housing.
6)
Now replace the safety disc and the transparent pump
cover.
The installation of the roller carrier is now completed.