BEFORE YOU START!
Planning
In order to set up a building to be operated by the controller you must:
• List the devices (fans, curtains, heaters, lights, misters, etc.) that are in the facility.
• Plan how each type of device will be grouped (turned on and off together).
• Determine optimum sensor locations.
• Determine which sensors will control each equipment group.
• Determine which controller output channel each equipment group will be connected to.
• Determine which controller input channel each sensor will be connected to.
• Determine the desired operational settings such as on/off temperature settings for each heating
and cooling group, etc. Input these settings into the controller.
• After you have documented, and thoroughly understand the set up information, you can begin
programming the controller. The System & Control Device Setup section of this manual describes
the process of programming the controller.
WARNING
1. A
QUALIFIED ELECTRICIAN
should perform all wiring to ensure
local and national codes are followed.
2. Disconnect all power and use LOCK OUT TAG OUT PROCEDURES before inspecting or
servicing equipment.
3. Protect yourself and others against electronic static discharge. In addition to shutting down the
power remember to GROUND yourself before working with this equipment.
4. Always use the proper wire size for wiring systems.
5.
Always use proper tools and wire connectors whenever working on this electronic equipment.
Splicing and taping wires is not adequate and may cause your control to operate incorrectly.