Product:
492 Ser.1
Date: 2-25-85
Change Reference: C102/285
Table 4-4A
EQUIPMENT REQUIRED EOR ADJUSTING FIRST CONVERTER BIAS
AND START SPUR AMPLITUDE
Test Equipment
|Characteristics
|Recommended Type
Digital Multimeter
|</=10 uV to >/=350 Vdc
1
|
TEKTRONIX DM502A and
|TM 500-Series Power Module
Sinewave Generator
|2.0 MHz, O dBm
j+10 dBm to -lOO dBm
|TEKTRONIX SG503
1
Power Meter
|must measure 0 dBm
|Hewlett-Packard 435B
Power Sensor
|
must measure 0 dBm
|@2 MHz
|Hewlett-Packard 8482A
1
Attenuator (13 dB)
1
|TEKTRONIX 2701
Coaxial Cable
1
|Tektronix Part N o .
(50 ohm)
1
|
175-2765-00
Coaxial Cable
1
|Tektronix Part N o .
(50 ohm)
1
|
175-2337-00
Coaxial Cable
1
|Tektronix Part N o .
(50 ohm)
1
|
175-3310-00
1. Preparation
a.
Remove the First Converter assembly from the spectrum analyzer,
and connect the cables as shown in Fig.4-23A.
Connect to ATIO
with 175-3310-00
cable
M ot·: A d ju itm n t it
tee in g tf* bock
of th · instrum ent
Connect to A13
with 175-2765-00
cable
Connect to AlO
with 175-2337-00
cable
Fig.4-23A First Converter test equipment setup.
Page 2 of 5
Содержание 492, 492P
Страница 12: ...492 492P Service Vol I SN B030000 up The 492 492P Spectrum Analyzer xii REV AUG 1981 ...
Страница 244: ...Theory of Operation 492 492P Service Vol 1 SN B030000 up REV AUG 1981 5 81 ...
Страница 256: ...Theory of Operation 492 492P Service Vol 1 SN B030000 up Fig 5 40 Frequency control encoder timing ...
Страница 263: ...Theory of Operation 492 492P Service Vol 1 SN B030000 up Fig 5 43 9914 GPIA block diagram 5 100 REV AUG 1981 ...
Страница 299: ...Product 492 Ser 1 Date 2 12 85 Change Ref M55287 Fig 5 28 Basic tune voltage converter Page 2 of 6 ...