
k. Connect the probe to the collectors of Q1043 and
Q1049. Adjust C4057 (Fig. 3-27) for the best response.
I. Connect the probe to the collectors of Q1072, Q2078
(Fig. 3-27), and adjust C4061 for the best response.
Calibration—492/492P Service Vol. 1 (SN B030000 & up)
Adjustment Procedure
m. Connect the probe to the collectors of Q1095,
Q2096 (Fig. 3-27), and adjust C5104 for best response.
n. Remove the probe and Ext Trigger connection to
TP1011.
o.
Check the appearance of "Z” in GHz of the frequency
readout. If necessary, adjust C5104 and C4061 (vertical
output) for the straightest top on the Z.
p. Set the Vertical Display to LIN and adjust REF LEV
EL for 100
m
V / .
Set TIME/DIV to MNL and adjust MANUAL
SCAN fully clockwise.
q.
Adjust C5021 and C4057 for best REF LEVEL
readout (straightest letters and numerals).
4. Adjust Sweep Timing
a.
Test equipment setup is shown in Fig. 3-28. Select
EXT Triggering, TIME/DIV of 10 ms, and a FREQ
SPAN/DIV of 10 MHz or less.
b.
Apply 10 ms time marks from the time-mark gener
ator to the EXT Video In (pins 2 and 1 of the ACCESSO
RIES jack, see Fig. 3-28) and the Trigger Output of the time-
mark generator to the EXT TRIG input on the back panel of
the 492/492P. This should provide a display of 10 ms
markers.
c.
Adjust Sweep Timing, R5105 (see Fig. 3-29), for 1
marker/division. (Use POSITION adjustments to align
markers.)
492 Back Panel showing J104 Accessory Connector
J104 Accessory
13
1
V··.·:.
25
14
&
Ext In
Gnd.
BNC to pin-jack adapter
oooo
Ext Video
Time Mark
Generator
■
• o
Marker Out
?
Trigger Out
2 7 2 7 - 1 7 A
Fig. 3-28. Test equipment setup for calibrating sweep timing.
3-48
REV JUN 1982
Содержание 492, 492P
Страница 12: ...492 492P Service Vol I SN B030000 up The 492 492P Spectrum Analyzer xii REV AUG 1981 ...
Страница 244: ...Theory of Operation 492 492P Service Vol 1 SN B030000 up REV AUG 1981 5 81 ...
Страница 256: ...Theory of Operation 492 492P Service Vol 1 SN B030000 up Fig 5 40 Frequency control encoder timing ...
Страница 263: ...Theory of Operation 492 492P Service Vol 1 SN B030000 up Fig 5 43 9914 GPIA block diagram 5 100 REV AUG 1981 ...
Страница 299: ...Product 492 Ser 1 Date 2 12 85 Change Ref M55287 Fig 5 28 Basic tune voltage converter Page 2 of 6 ...