6.
To agree, click the
‘Confirm’
button (Fig. 162).
Fig. 163: Flap position confirmed
7.
If you have verified the parameter setting, press the
‘Start’
button
(Fig. 163). When the green highlighted frame appears in the ‘Treatment’
screen, finally press the ‘Procedure’ footswitch. Remember to keep the
footswitch pressed during the whole procedure.
The
‘Procedure’
footswitch must be pressed from the start of the procedure
until the end of the procedure! If you release the
‘Procedure’
footswitch, the
treatment will pause. Press the footswitch again to continue the treatment.
ð
An acoustic signal is emitted during the procedure.
The progress is displayed in the
‘Flap’
progress bar (Fig. 164).
L
WARNING! Rough beds or tissue bridges can occur due to cor‐
recting vertical shear force movement!
Vertical force may slowly decrease, or the executed shear force
may change while the procedure is being performed. If this
decrease or the change is corrected, it can affect the alignment or
the result of the treatment and cause severe patient injuries.
– You must not correct slowly decreasing vertical force or
changing shear force.
TREATMENT
9
SKU: 70005780TPV * Version 6 * UM-100010770 GB
9 - 53
TPV Controlled Document / Status: Effective / Effective Date: Jun 14, 2017 2:38:46 PM
UM-100010770 / Version 6 / Page 179 of 207
Содержание Victus
Страница 1: ...User Manual VICTUS Femtosecond Laser Platform SW V3 3 SP02 UM 100010770 GB SKU 70005780TPV Version 6 ...
Страница 12: ...GENERAL INFORMATION A SKU 70005780TPV Version 6 UM 100010770 GB A 4 ...
Страница 16: ...INTRODUCTION 1 SKU 70005780TPV Version 6 UM 100010770 GB 1 4 ...
Страница 48: ...CLINICAL APPLICATIONS 5 SKU 70005780TPV Version 6 UM 100010770 GB 5 6 ...
Страница 186: ...TREATMENT 9 SKU 70005780TPV Version 6 UM 100010770 GB 9 60 ...
Страница 201: ...Appendix 13 SKU 70005780TPV Version 6 UM 100010770 GB 13 1 ...
Страница 202: ...Table of contents A EMC declaration APPENDIX 13 SKU 70005780TPV Version 6 UM 100010770 GB 13 2 ...