4.
Click the
‘OK’
button to close the message ‘Pressure test successful.’ .
ð
The ‘Pressure test’ screen closes and the status indicator turns green
(Fig. 106).
9.3.5
Performing the power test
The following section describes how to perform the
‘Power test’
for
cataract
/
thera‐
peutic
and
corneal
treatments.
Special tool:
n
Detector head
n
Power meter
n
Support block
1.
Click the
‘System test’
button (Fig. 27/5) on the ‘Main menu’ screen.
2.
Click the
‘Power test’
button (Fig. 45/5) to open the ‘Power test’ screen.
Fig. 107:
‘Power test’
‘Preparation’
screen
3.
Follow the instructions in the ‘Power test’ screen.
Fig. 106:
‘Pressure test’
successful
TREATMENT
9
SKU: 70005780TPV * Version 6 * UM-100010770 GB
9 - 6
TPV Controlled Document / Status: Effective / Effective Date: Jun 14, 2017 2:38:46 PM
UM-100010770 / Version 6 / Page 132 of 207
Содержание Victus
Страница 1: ...User Manual VICTUS Femtosecond Laser Platform SW V3 3 SP02 UM 100010770 GB SKU 70005780TPV Version 6 ...
Страница 12: ...GENERAL INFORMATION A SKU 70005780TPV Version 6 UM 100010770 GB A 4 ...
Страница 16: ...INTRODUCTION 1 SKU 70005780TPV Version 6 UM 100010770 GB 1 4 ...
Страница 48: ...CLINICAL APPLICATIONS 5 SKU 70005780TPV Version 6 UM 100010770 GB 5 6 ...
Страница 186: ...TREATMENT 9 SKU 70005780TPV Version 6 UM 100010770 GB 9 60 ...
Страница 201: ...Appendix 13 SKU 70005780TPV Version 6 UM 100010770 GB 13 1 ...
Страница 202: ...Table of contents A EMC declaration APPENDIX 13 SKU 70005780TPV Version 6 UM 100010770 GB 13 2 ...