D
ON’T
FORGET
Make sure you move the voltage selector switch to the correct position for your
power supply
.
Preparation for Operation
Before switching on, check the following:
✓
The UltraTWIN
is mounted correctly and is in a ‘safe’ area.
✓
The power supply is correctly installed.
✓
The voltage selector switch is in the correct position.
✓
The relays are connected correctly.
Important Information
If the equipment is installed or used in a manner not specified in this
manual, then the protection provided by the equipment may be impaired.
Important Information
The rear metal case of the fascia unit must be connected to earth via
the earthing stud located on the rear of the unit, see drawing above,
using wiring to meet local requirements.
Before applying AC power (mains), make sure the supply is 115V AC.
Never operate the
UltraTWIN
with terminal access exposed.
An external switch or circuit breaker should be installed near to the
UltraTWIN
to allow the supply to be removed during installation and
maintenance. In addition, the relay contacts should also have a means of
isolating them from the
UltraTWIN
.
Interconnecting cables must be adequately insulated in accordance with
local regulations. Strip back 30 mm of the outer insulation of the cable.
Strip 5 mm of insulation from the end of each conductor. Twist all
exposed strands of the conductor together. Insert the stripped conductor
into the terminal block as far as it will go and tighten the terminal block
screw. Ensure that all strands are firmly clamped in the terminal block and
that there is no excess bare conductor showing, and no stray strands.
Содержание UltraTWIN
Страница 1: ...UltraTWIN UL Instruction Manual...
Страница 2: ...2...
Страница 15: ...PULSAR MEASUREMENT 15 EU Certificate of Conformity...
Страница 24: ...ULTRATWIN UL INSTRUCTION MANUAL 24 Fascia Mount The terminal details are as illustrated below...
Страница 213: ...PULSAR MEASUREMENT 213 NOTES...