MGC Administrator’s Guide
D-21
IP Test
fields. For a description of completing the
IP Test
fields, see “IP
7.
Click
Run
.
The test results appear in the
Test Results
pane. For a detailed description
of the Test Summary pane, see “Test Results Pane” on page D-12.
Post Testing Procedure for MGC-25 Units
•
After all the tests have been completed on an MGC-25 unit, remove the
ISDN Loopback cable.
To save the table that is displayed in the Tests Results window to the
Falcon Logs folder:
•
In the
Test Results
pane, click the
Save Summary
button. The log is
named using the MCU name, Slot ID, Card name, Unit, Processor and
Word summary.
To save the faults details as they appear in the Details box:
•
After the tests are completed, click the
Save Details
button in the
Test
Results
pane.
The Test Results, Faults and Summaries are saved together with the Log files
in the folder designated for that purpose when the Log file path was set. These
files can be sent to support personnel to help them understand any problems
with the hardware that may appear after the diagnostics are run.
Test Results
The test results appear dynamically in the
Test Results
pane as the tests run.
Whenever you connect to an MCU, a new log file is started. All Falcon
functions are saved to a log file. The
Log
option in the main menu enables
you to define the location of the folder where the log files are sent. You can
restrict the logs to record only detected faults discovered during a diagnostic
test. These log files can be sent to your System Administrator to help resolve
any problems that might occur. In addition, any Test Results or Test
Summaries are sent to the folder in which the log files are stored.
If you save
Only Faults
in the
Log
menu, files with just the faults discovered
in the test results will be available in the log file folder. Otherwise, all the
results are recorded.
Содержание MGC Administrator
Страница 1: ...MGC Administrator s Guide Version 7 5 ...
Страница 4: ......
Страница 50: ...Chapter 2 Software Installation 2 32 ...
Страница 408: ...Chapter 6 Defining Operators 6 12 ...
Страница 482: ...Chapter 7 Configuring the Gateway 7 74 ...
Страница 496: ...Chapter 8 Audio and Video Conversion Tools 8 14 ...
Страница 534: ...Appendix B PPP Setup B 24 ...