Installation
In This Chapter
This chapter discusses the proper way to unpack and level the machine, pre-run preparation
steps, how to connect the electrical and air supplies, and any final checks necessary before
starting the machine.
Receiving the Machine
Important:
Thoroughly inspect machine for shipping damages before and after
removing from transport carrier's vehicle. Note any apparent
damages and capture with video or digital photos. Indicate any
areas of damage on shipping documents and with Pearson
Technical at 800-732-7766.
1.
Inspect the machine for parts damaged during shipping. If damaged parts are
found, advise the carrier and contact Pearson Packaging Systems' Service
Department at 800-732-7766.
Note:
If the machine arrives with change parts, unpack the box carefully and identify all
parts. Notify Pearson's Service Department at 800-732-7766 if parts are missing.
Unpacking and Moving the Machine
1.
After inspecting the machine, use a fork lift or electric pallet jacks to slide
the skidded machine to the work location.
Important:
To protect the machine feet from damage, leave the machine
skidded when moving.
To prevent damage to the machine ensure the fork lift forks or
pallet jack forks bear against the skid only when moving the
machine.
2.
At the work location, uncrate carefully. Remove the lag screws that secure
the machine to the pallet base.
3.
Lift machine off the shipping pallet.
Operations Manual
CE35-T Case Erector
M-CE35T-2c Horiz Mag
3/2/2010
In
s
ta
ll
a
ti
o
n
23