Running the Machine
Pre-Run Steps/
Entanglement Hazard! Keep hands clear. Failure to
comply could result in death or serious injury.
1.
Load knocked down blanks in the magazine with the bottom flaps toward the
hot melt adhesive side of the
machine and the end panel of the
case at the Magazine deck looking
at the case from the setup area.
a.
The manufacturer’s joint
should be facing the vacuum
cups.
Operations Manual
CE35-T Case Erector
M-CE35T-2c Horiz Mag
3/2/2010
M
a
c
h
in
e
O
p
e
ra
ti
o
n
35
Fig. 27: Loading the Magazine
Case's End
Panel