![Pearson CE35-T Case Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/pearson/ce35-t-case/ce35-t-case_operation-manual_1518010043.webp)
Operating Sequence
In This Chapter
This chapter provides a detailed sequence of
machine operation.
Machine Operating Sequence
1.
Knocked down blanks are stacked
on edge on the bed of the case
magazine.
2.
Vacuum cups mounted on the
pickoff arm grab one knocked
down blank from the magazine.
Operations Manual
CE35-T Case Erector
M-CE35T-2c Horiz Mag
3/2/2010
O
p
e
ra
ti
n
g
S
e
q
u
e
n
c
e
27
Fig. 17: Blanks Stacked in Magazine
Fig. 18: Pickoff Arm Pulling Blank from
Magazine
Pickoff Arm