10 Controlling with the operational unit
-
86
-
10 Controlling with the operational unit
This section covers how to change the data in the
EMP400
Series with the operational unit
OP300
.
10.1 Installing and connecting the operational unit
Install the operational unit on an appropriate flat metal plate having high resistance to vibration.
Use a metal plate with a thickness of 3 mm (0.12 in.) or less.
If the metal plate is thicker than 3 mm (0.12 in.), the modular connector on the supplied cable cannot be
connected.
Location for installation
•
Inside an enclosure that is installed indoors (provide vent holes)
•
Operating ambient temperature 0 to +50 °C (+32 to +122 °F) (non-freezing)
•
Operating ambient humidity 20 to 85% (non-condensing)
•
Area that is free of explosive atmosphere or toxic gas (such as sulfuric gas) or liquid
•
Area not exposed to direct sun
•
Area free of excessive amount of dust, iron particles or the like
•
Area not subject to splashing water (rains, water droplets), oil (oil droplets) or other liquids
•
Area free of excessive salt
•
Area not subject to continuous vibration or excessive shocks
•
Area free of excessive electromagnetic noise (from welders, power machinery, etc.)
•
Area free of radioactive materials, magnetic fields or vacuum
Installing the operational unit
Install operational unit from the front side of the mounting hole.
䊶
Dimension of mounting hole [mm (in.)]
139
+0.5
0
( )
5.47
+0.02
0
45
+0.5
0
(1.77
+0.02
)
0
Содержание EMP400 Series
Страница 115: ......