CHAPTER 2 INSTALLATION
– 72 –
NWA-008841-001 Rev.5.0
90ch2001.fm
PROCEDURE
This flowchart explains the procedures for installing the PBX system. You should follow the procedure
shown below.
Procedure Flowchart
Continued on next page
START
UNPACKING
INSTALLATION
OF
MAIN EQUIPMENT
BATTERY
CONNECTION
TERMINATION OF
CABLES ON MDF
SUPPLY VOLTAGE CHECK
AND
HEAT RUN TEST
CABLE RUNNING
TO MDF
INSTALLATION
OF
PERIPHERAL EQUIPMENT
A
POWER CABLE
CONNECTION
SWITCH SETTINGS
OF
CIRCUIT CARDS
REFER TO
“CHAPTER 3”
Page 289
Page 75
Page 82
Page 111
Page 121
Page 129
Page 137
Page 144
Page 173
WIRING AC CABLE
TO
TERMINALS
Page 76
PROCEDURE
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...