CHAPTER 2 INSTALLATION
– 112 –
NWA-008841-001 Rev.5.0
90ch2001.fm
• Connection of AC CORD-B
(1) Connect the AC CORD-B to the CN1 connector on the PZ-PW121/PZ-PW126 card.
(2) Screw the ground cable of the AC CORD-B to the frame ground terminal on the PIM.
Connection of AC CORD-B
CORD BUSH
BASE
TERMINAL BLOCKS
FRONT
PZ-PW121/PZ-PW126
CN1
AC CORD-B
AC CORD-D
TO 120 V/240 V AC POWER SOURCE
POWER CABLE CONNECTION
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...