– 380 –
NWA-008841-001 Rev.5.0
90ch3003.fm
NOTE 1:
Set the groove on the switch to the desired position.
NOTE 2:
When the power is on, flip the MB switch to ON (UP position) before plugging/unplugging the
circuit card.
NOTE 3:
When source clock signal is supplied via the line between the Main Site and the Remote Site, set
the SW1-1 and SW1-2 as the following table. In this case, DAIA cards (DAIA0, DAIA1) must be
mounted in PIM0.
CONDITIONS
DAIA0
DAIA1
· · · ·
DAIA5
REMARKS
SW
1-1
SW
1-2
SW
1-1
SW
1-2
SW
1-1
SW
1-2
One DAIA card is
provided.
ON
OFF
–
–
–
–
The clock signal is sent
to PLO0 of MP card via
supply route 0
(DAIA0).
Two or three
DAIA cards are
provided.
ON
OFF OFF
ON
OFF OFF The clock signal supply
route is automatically
changed to the route 1
(DAIA1), if a transmis-
sion line failure occurs
on the supply route 0.
PN-DAIA-A (DAIA)
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...