– 280 –
NWA-008841-001 Rev.5.0
90ch2002.fm
CHAPTER 2 INSTALLATION
OPERATION TEST
Confirm the entered system data and hardware, including cable connection, by completing the following
operational tests.
• Basic Connection Test at MDF
Station Line Test (Operator Call from all stations)
Central Office Trunk Test (Incoming, Outgoing)
Tie Line Trunk Test (Incoming, Outgoing)
• Service Feature Test
Call Transfer
Step Call
Executive Right of Way (Executive Override)
Call Hold
Call Back
Call Forwarding-All Calls/Don’t Answer (No Answer)/Busy Line
Call Pickup
Station Hunting-Pilot/Circular
Speed Calling-Station/System (Station Speed Dialing/System Speed Dialing)
Paging Access (External Paging with Meet-me)
Announcement Service
Other selected features
NOTE:
Feature names in the parenthesis are for North America.
OPERATION TEST
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...