CHAPTER 2 INSTALLATION
– 126 –
NWA-008841-001 Rev.5.0
90ch2001.fm
• Power Routing
NOTE 1:
PN-4LCD/4LCF/4LCL/4LCW card pr80 V on-board power supply (+80 VOBP).
NOTE 2:
PN-2DLCB/PN-2DLCN, PN-2LDTA, PN-2ODTA/2ODTB card provides –48 V on-board pow-
er supply (–48 VOBP).
+5 V
-27 V
CR
-48 V
-48 V
DC IN
DC IN
PZ-PW135
+5 V
-5 V
-5 V
+5 V
+80 V
-27 V
-27 V
CR
CR
PZ-PW135
NOTE 1
+80 VOBP
+5 V
-48 V
-27 V
CR
NOTE 2
AC CORD-B
TERMINAL
BLOCKS
BASE
PIM0
PIM1
TO PIM2
INSTALLATION
CABLE
-48 VOBP
SUPPLY VOLTAGE CHECK AND HEAT RUN TEST
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...