CHAPTER 2 INSTALLATION
– 73 –
NWA-008841-001 Rev.5.0
90ch2001.fm
Procedure Flowchart
For Floor Standing Installation, there are three kinds of method to install the equipment. It depends on the
country according to the UL/cUL/ACA.
NOTE:
UL
= Underwriters Laboratories (U.S.A.)
cUL = Canadian Underwriters Laboratories (Canada)
ACA = Australian Communication Authority (Australia)
“Stationary Equipment (For North America, Latin America, Australia)”
“Fixed Equipment 1 (For North America, Latin America, Australia)”
“Fixed Equipment 2 (For Asia, Africa, Europe, Middle East)”
See next page.
A
END
MOUNTING
MOUNTING FRONT COVER
CIRCUIT CARDS
SYSTEM
SYSTEM DATA ENTRY
CLEANING
AND
VISUAL CHECK
INITIALIZATION
OPERATION TEST
SYSTEM DATA SAVE
Page 275
Page 277
Page 278
Page 280
Page 281
Page 281
Page 282
PROCEDURE
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...