CHAPTER 2 INSTALLATION
– 108 –
NWA-008841-001 Rev.5.0
90ch2001.fm
• Connection of 19
″
RACK BRACKET (B)
(1) Place the BASE PLATE on the 19
″
RACK BRACKET (B).
(2) Secure the BASE PLATE with four washer and nuts.
(3) Mount the BASE to the BASE PLATE.
(See
“Connection of BASE and BASE PLATE”
.
Page 91
)
(4) Mount the Module to the BASE.
(See
“Connection of Module and BASE”
.
Page 92
)
NOTE:
Nuts and washers are attached to the 19
″
RACK BRACKET (B).
Connection of 19
″
RACK BRACKET (B)
NUT
WASHER
19
″
RACK BRACKET (B)
BASE PLATE
INSTALLATION OF MAIN EQUIPMENT
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...