CHAPTER 2 INSTALLATION
– 107 –
NWA-008841-001 Rev.5.0
90ch2001.fm
• Mounting PIM to 19-inch RACK
(1) Mount the PIM with 19
″
RACK BRACKET (A) into the 19-inch RACK.
(2) Secure them with four screws (locally provided).
Mounting PIM to 19-inch Rack
NOTE:
The BATTM cannot be installed in the 19-inch RACK.
19
″
RACK BRACKET (A)
SCREWS
NOTE
JULY/1/2006
INSTALLATION OF MAIN EQUIPMENT
Содержание UNIVERGE NEAX 2000 IPS