– 179 –
NWA-008841-001 Rev.5.0
90ch2002.fm
• 2W E&M Trunk (PN-2ODT)
When connecting the E and M, make the installation cable by using the connector attached with the
PN-2ODT card.
NOTE:
Both No. 0 and No. 1 circuits must be set to same purpose (2-wire or 4-wire) in one PN-2ODT
card.
MDF Cross Connection for 2W E&M Trunk Card
Continued on next page
1
26
3
28
R0
T0
R2
T2
MDF
LEN001 (No. 1)
LEN000 (No. 0)
PIM0
PN-2ODT
LT00
LEN001 (No. 1)
1
26
3
28
(M)
TO TIE LINE
J
P
LTC0
LEN000 (No. 0)
CN1
08
07
06
05
04
M1
03
E1
02
M0
01
E0
(E)
(Ring)
(Tip)
J
INSTALLATION CABLE
2
1
Tie Line Trunk (LDT/ODT)
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...