![background image](http://html.mh-extra.com/html/nec/univerge-neax-2000-ips/univerge-neax-2000-ips_installation-manual_251421103.webp)
CHAPTER 2 INSTALLATION
– 87 –
NWA-008841-001 Rev.5.0
90ch2001.fm
• Drilling
(1) Make a preliminary hole in the concrete, using a drill bit for small-diameter holes.
(2) Drill a hole in the concrete with a drill suitable for a plug bolt a little deeper than the plug bolt
length.
Anchor Bolt Size :10 mm (0.39 inch) DIA for Fixed Equipment
6 mm (0.24 inch)
DIA for Stationary Equipment
(3) Insert the anchor bolt into the hole.
(4) Push anchor bolt until the bolt stays permanently in place.
(5) Turn bolt counterclockwise and remove.
(6) Insert bolts correctly into the holes for equipment installation, then tighten them properly.
Drilling Instructions for Anchor Bolt
(3)
(4)
(5)
(6)
(1)
(2)
INSTALLATION OF MAIN EQUIPMENT
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008841 001 ISSUE 5 0 Installation Procedure Manual ...
Страница 24: ... 8 NWA 008841 001 Rev 5 0 90ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 76: ... 60 NWA 008841 001 Rev 5 0 90ch1001 fm THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 106: ...CHAPTER 2 INSTALLATION 90 NWA 008841 001 Rev 5 0 90ch2001 fm 5 REMOVE FRONT COVER INSTALLATION OF MAIN EQUIPMENT ...
Страница 148: ...CHAPTER 2 INSTALLATION 132 NWA 008841 001 Rev 5 0 90ch2001 fm Internal Battery Mounting TIE WRAP BATTERY CONNECTION ...